Trains between Chomutov and Kadaň will speed up, they will stop closer to municipality in Málkov
More than 12 km of the line section will be reconstructed, including a branch line that allows direct travel between Kadaň and Žatec. The Málkov stop will be moved closer to the municipality and will gain a modern appearance. At the Kadaň-Prunéřov station, the builders will renovate both existing platforms and build a new one. All of them will enable comfortable boarding on train sets, barrier-free access will be ensured by lifts. A clear information and orientation system for passengers and new furnishing will be available at both stations.
There will be 4 bridges and 19 culverts undergoing reconstruction. The level crossing at the current stop in Málkov will be eliminated and the relocated platforms will be accessed via a reconstructed footbridge. Instead of another level crossing, a road overpass will be built.
Trains will be supervised by new signalling system and the line speed will increase from
100 to 160 km/h. The transition to alternating electrical voltage will result in lower operating and maintenance costs.
Soubory ke stažení
press release to download (57.4 kB) |